Switchgear MCQs — Set 10
10 practice questions on selecting switchgear — fault level, standards, spare capacity, shock protection and sizing worked examples, with answers and explanations.
Q1. What is the first thing to check when selecting switchgear for a site?
- (a) The colour of the panels
- (b) The system voltage and the prospective fault level at that point
- (c) The brand of the relay
- (d) The length of the cables
Answer: (b) The system voltage and the prospective fault level at that point — the gear must be rated for both, or it will fail dangerously on a fault.
Q2. A circuit breaker’s breaking capacity must be:
- (a) Equal to the load current
- (b) Greater than or equal to the maximum prospective fault current
- (c) Less than the fault current
- (d) Equal to the making capacity
Answer: (b) Greater than or equal to the maximum prospective fault current — a breaker rated below the fault level can explode when it tries to clear the fault.
Q3. The main IEC standard for high-voltage switchgear and controlgear is:
- (a) IEC 60076
- (b) IEC 62271
- (c) IEC 60364
- (d) IEC 61000
Answer: (b) IEC 62271 — it covers high-voltage switchgear and controlgear; IEC 60076 is transformers and IEC 60364 is low-voltage installations.
Q4. Why should switchgear be ordered with spare ways (spare feeders)?
- (a) To increase the fault level
- (b) To allow future loads to be added without replacing the board
- (c) To reduce the cost
- (d) To improve the power factor
Answer: (b) To allow future loads to be added without replacing the board — spare ways make expansion cheap and quick.
Q5. For protection against electric shock in final circuits, an RCCB/RCD is chosen with a sensitivity of:
- (a) 300 mA
- (b) 100 mA
- (c) 30 mA
- (d) 1 A
Answer: (c) 30 mA — a 30 mA RCCB trips fast enough to protect people from a dangerous shock; higher ratings are for fire protection only.
Q6. What is the breaking capacity of switchgear rated 11 kV with a short-circuit current of 25 kA?
- (a) 275 MVA
- (b) 476 MVA
- (c) 250 MVA
- (d) 550 MVA
Answer: (b) 476 MVA — breaking capacity = √3 × kV × kA = 1.732 × 11 × 25 = 476 MVA.
Q7. A 50 kW three-phase load at 0.8 power factor and 400 V draws about 90 A. With a 25% margin, what breaker size should be chosen?
- (a) 63 A
- (b) 100 A
- (c) 125 A
- (d) 250 A
Answer: (c) 125 A — current = 50,000 ÷ (1.732 × 400 × 0.8) = 90.2 A; with 25% margin, 90.2 × 1.25 = 112.8 A, so the next standard size is 125 A.
Q8. Switchgear installed in a polluted or coastal environment should have:
- (a) Lower insulation levels
- (b) Higher creepage distances, or be indoor/GIS type
- (c) No earthing
- (d) Smaller clearances
Answer: (b) Higher creepage distances, or be indoor/GIS type — pollution and salt shorten insulation life, so longer creepage or enclosed SF6 gear is needed.
Q9. When choosing between AIS and GIS for a new substation, the deciding factors are mainly:
- (a) Colour and brand only
- (b) Available land, cost and reliability needs
- (c) The number of staff
- (d) The frequency of the supply
Answer: (b) Available land, cost and reliability needs — GIS costs more but saves land and resists pollution; AIS is cheaper where land is plentiful.
Q10. Which combination gives the best balance of safety and continuity of supply for an 11 kV distribution substation?
- (a) Single busbar with fixed breakers and no spare ways
- (b) Metal-clad draw-out VCB panels with proper interlocks, protection relays and spare feeders
- (c) Open knife switches with fuses only
- (d) Outdoor isolators with no breakers
Answer: (b) Metal-clad draw-out VCB panels with proper interlocks, protection relays and spare feeders — safe compartmentalisation, fast maintenance and room to grow.
Also read: Cable Sizing MCQs | All MCQ Topics