PLC Basics MCQs — Set 10
10 practice questions on PLC troubleshooting, safety, communication and maintenance — with answers and explanations.
Q1. A PLC output does not energise. What is the first thing to check?
- (a) Replace the CPU immediately
- (b) Check the rung in the program, the input status and the output LED to see whether the logic is true and the output is being driven
- (c) Rewire the whole panel
- (d) Switch the factory power off
Answer: (b) Check the rung in the program, the input status and the output LED to see whether the logic is true and the output is being driven — most faults are a false rung, a failed input or a wiring fault, not a dead CPU.
Q2. The output LED on a PLC module is ON, but the load (for example a lamp) stays off. What is the most likely cause?
- (a) The program is wrong
- (b) An open wire, blown fuse or failed load between the output terminal and the load
- (c) The scan time is too short
- (d) The input module has failed
Answer: (b) An open wire, blown fuse or failed load between the output terminal and the load — the LED shows the PLC is driving the output, so the fault is in the field wiring or the load itself.
Q3. What is “forcing” an I/O point in a PLC?
- (a) Deleting the program
- (b) Temporarily overriding an input or output to a fixed ON or OFF state for testing, regardless of the program
- (c) Increasing the scan time
- (d) Replacing a module
Answer: (b) Temporarily overriding an input or output to a fixed ON or OFF state for testing, regardless of the program — forcing is a test tool and must always be removed before the machine returns to service.
Q4. A 24 V DC PLC power supply feeds a load drawing 2 A. How much power does the load use?
- (a) 12 W
- (b) 24 W
- (c) 48 W
- (d) 96 W
Answer: (c) 48 W — P = V × I = 24 × 2 = 48 W.
Q5. A 24 V DC, 5 A PLC power supply is fitted. What is the maximum power it can deliver?
- (a) 24 W
- (b) 48 W
- (c) 120 W
- (d) 240 W
Answer: (c) 120 W — P = V × I = 24 × 5 = 120 W, so the total load on the supply must stay below 120 W.
Q6. Which of these is a common communication protocol used between PLCs and other devices?
- (a) Modbus
- (b) HDMI
- (c) Bluetooth audio
- (d) Wi-Fi Direct only
Answer: (a) Modbus — an open protocol widely used for PLC-to-PLC, PLC-to-HMI and PLC-to-SCADA communication, over serial or Ethernet.
Q7. What is Modbus used for in a PLC system?
- (a) Supplying power to the sensors
- (b) Letting PLCs, HMIs and SCADA exchange data such as readings, setpoints and alarms
- (c) Programming the ladder logic
- (d) Cooling the control panel
Answer: (b) Letting PLCs, HMIs and SCADA exchange data such as readings, setpoints and alarms — Modbus is a data-exchange protocol, not a power or programming method.
Q8. Why must an emergency stop (E-stop) be hard-wired and NOT depend only on the PLC program?
- (a) To save program memory
- (b) Because the E-stop must cut power even if the PLC program crashes, the CPU faults or the PLC loses power
- (c) To make the scan faster
- (d) Because PLCs cannot read pushbuttons
Answer: (b) Because the E-stop must cut power even if the PLC program crashes, the CPU faults or the PLC loses power — safety circuits must work independently of the controller they protect.
Q9. Why should a backup copy of the PLC program be kept off the machine?
- (a) To make the PLC run faster
- (b) So the program can be reloaded quickly if the CPU or its memory fails
- (c) To reduce the scan time
- (d) To increase the output current
Answer: (b) So the program can be reloaded quickly if the CPU or its memory fails — without a backup, a failed CPU means rewriting the whole program from scratch.
Q10. Why are analogue signal cables for a PLC usually shielded, with the shield earthed at one end?
- (a) To make the cable stronger
- (b) To reduce electrical noise picked up from nearby power cables, which would corrupt the 4–20 mA or 0–10 V reading
- (c) To increase the signal voltage
- (d) To cool the cable
Answer: (b) To reduce electrical noise picked up from nearby power cables, which would corrupt the 4–20 mA or 0–10 V reading — earthing at one end avoids earth loops while the shield blocks interference.
Also read: Logic Gates Explained | Electrical Safety MCQs | All MCQ Topics