NEC Code MCQs — Set 5

10 practice questions on NEC Article 300 wiring methods — conduit fill, burial depths, boxes and cable rules.

Q1. What is the maximum conduit fill when three or more conductors are installed in a raceway?

  • (a) 31%
  • (b) 40%
  • (c) 53%
  • (d) 60%

Answer: (b) 40% — NEC Chapter 9 Table 1 allows 40% fill for three or more conductors, so heat can escape and conductors can be pulled without damage.

Q2. What is the maximum conduit fill for a single conductor in a raceway?

  • (a) 31%
  • (b) 40%
  • (c) 53%
  • (d) 80%

Answer: (c) 53% — NEC Chapter 9 Table 1 allows 53% fill for one conductor.

Q3. What is the maximum conduit fill for two conductors in a raceway?

  • (a) 25%
  • (b) 31%
  • (c) 40%
  • (d) 53%

Answer: (b) 31% — NEC Chapter 9 Table 1 allows 31% fill for two conductors, because two round conductors jam more easily than three.

Q4. How many 1.5 mm² wires are allowed in a 20 mm surface conduit?

  • (a) 8 wires
  • (b) 10 wires
  • (c) 13 wires
  • (d) 20 wires

Answer: (c) 13 wires — per the conduit capacity table, a 20 mm conduit holds 13 wires of 1.5 mm² at the 40% fill limit.

Q5. How many 2.5 mm² wires are allowed in a 25 mm surface conduit?

  • (a) 10 wires
  • (b) 13 wires
  • (c) 16 wires
  • (d) 22 wires

Answer: (c) 16 wires — per the conduit capacity table, a 25 mm conduit holds 16 wires of 2.5 mm² at the 40% fill limit.

Q6. What is the minimum burial depth for direct-buried UF cable under NEC Table 300.5?

  • (a) 6 in
  • (b) 12 in
  • (c) 18 in
  • (d) 24 in

Answer: (d) 24 in — direct-buried cable must be at least 24 in deep, the deepest of the common wiring methods.

Q7. What is the minimum burial depth for PVC conduit under NEC Table 300.5?

  • (a) 6 in
  • (b) 12 in
  • (c) 18 in
  • (d) 24 in

Answer: (c) 18 in — PVC (nonmetallic) conduit must be buried at least 18 in deep.

Q8. What is the minimum burial depth for rigid metal conduit (RMC) under NEC Table 300.5?

  • (a) 6 in
  • (b) 12 in
  • (c) 18 in
  • (d) 24 in

Answer: (a) 6 in — rigid metal conduit needs only 6 in of cover because the steel provides strong mechanical protection.

Q9. After installation, must junction and pull boxes remain accessible?

  • (a) No, they can be buried in walls
  • (b) Yes, they must be accessible without removing any part of the building
  • (c) Only in commercial buildings
  • (d) Only if they contain splices

Answer: (b) Yes, they must be accessible without removing any part of the building — NEC 314.29 requires boxes to stay accessible for inspection and maintenance.

Q10. Where is NM (nonmetallic-sheathed) cable NOT permitted?

  • (a) Inside dry interior walls of a dwelling
  • (b) In damp or wet locations
  • (c) In an attic
  • (d) In a basement ceiling

Answer: (b) In damp or wet locations — NEC 334.12 forbids NM cable in wet or damp locations and in ducts or plenums, though it is fine in dry dwelling walls, attics and basements.