Electrical Drawing Symbols MCQs — Set 9

10 practice questions on as-built drawings, drawing standards and the common mistakes that make drawings useless.

Q1. What is an as-built drawing?

  • (a) A drawing made before the work starts
  • (b) A drawing updated to record exactly what was actually installed on site
  • (c) A drawing of the building’s structure only
  • (d) A drawing that is never used again

Answer: (b) A drawing updated to record exactly what was actually installed on site — it is the true record handed over to the owner.

Q2. Which international standard defines the graphical symbols used in electrical diagrams?

  • (a) IEC 60617
  • (b) ISO 9001
  • (c) IEC 60364
  • (d) IS 732

Answer: (a) IEC 60617 — it is the standard collection of graphical symbols for electrical diagrams.

Q3. What is the most common mistake when drawing electrical symbols by hand?

  • (a) Using non-standard, made-up symbols that other people cannot understand
  • (b) Drawing the symbols too neatly
  • (c) Using a ruler
  • (d) Labelling every symbol

Answer: (a) Using non-standard, made-up symbols that other people cannot understand — a drawing only works if everyone reads the same symbols.

Q4. What happens if a drawing has no legend and uses unusual symbols?

  • (a) Nothing — the electrician will guess correctly
  • (b) The drawing can be misread, causing wrong wiring, rework and safety risks
  • (c) The drawing becomes cheaper to print
  • (d) The drawing is automatically approved

Answer: (b) The drawing can be misread, causing wrong wiring, rework and safety risks — the legend is what makes an unfamiliar symbol readable.

Q5. A circuit is changed on site but the drawing is not updated. What is the result?

  • (a) No problem at all
  • (b) Future fault-finding and additions will follow a wrong drawing and may cause danger
  • (c) The circuit will stop working immediately
  • (d) The drawing becomes more valuable

Answer: (b) Future fault-finding and additions will follow a wrong drawing and may cause danger — the drawing must always match what is actually installed.

Q6. What does an approval stamp on a drawing mean?

  • (a) The drawing has been checked and approved for use
  • (b) The drawing is only a rough sketch
  • (c) The drawing is out of date
  • (d) The drawing belongs to the client

Answer: (a) The drawing has been checked and approved for use — only approved drawings should be used for construction.

Q7. What is the difference between a “for tender” drawing and a “for construction” drawing?

  • (a) A tender drawing is used for pricing the job; a construction drawing is the final approved version for building
  • (b) A tender drawing is always in colour
  • (c) A construction drawing has no dimensions
  • (d) There is no difference

Answer: (a) A tender drawing is used for pricing the job; a construction drawing is the final approved version for building — work must only start from the construction issue.

Q8. A socket is drawn on the wrong wall of a room. What is the most likely consequence?

  • (a) The socket will work better
  • (b) The socket is fixed in the wrong place and must be moved, costing time and money
  • (c) The circuit breaker will trip
  • (d) The voltage will drop

Answer: (b) The socket is fixed in the wrong place and must be moved, costing time and money — one wrong symbol position on paper becomes real rework on site.

Q9. Which of these must always match between the drawing and the actual installation?

  • (a) The colour of the paper
  • (b) The cable sizes, routes and breaker ratings
  • (c) The name of the drawing software
  • (d) The number of pages

Answer: (b) The cable sizes, routes and breaker ratings — these decide safety and performance, so they must agree with the real work.

Q10. On a 1:100 scale drawing, a wall measures 2.5 cm on paper. What is its real length?

  • (a) 1.25 m
  • (b) 2.5 m
  • (c) 5 m
  • (d) 25 m

Answer: (b) 2.5 m — at 1:100, 1 cm on paper = 100 cm = 1 m, so 2.5 cm = 2.5 m.