Electrical Maintenance MCQs — Set 2

10 practice questions on maintenance schedules, planning, checklists and work priorities — with answers and explanations.

Q1. Why is routine electrical maintenance usually scheduled during a planned shutdown?

  • (a) So the work can be done while the equipment is still running
  • (b) So the work does not interrupt production and the equipment can be safely isolated
  • (c) Because shutdowns make the work take longer
  • (d) Because test instruments only work during a shutdown

Answer: (b) So the work does not interrupt production and the equipment can be safely isolated — a planned shutdown gives a safe window to switch off, lock out and work on equipment without stopping work unexpectedly.

Q2. What is the main purpose of a maintenance checklist?

  • (a) To make the job take as long as possible
  • (b) To make sure every required check is done, in order, every time
  • (c) To replace the need for skilled technicians
  • (d) To record the price of spare parts

Answer: (b) To make sure every required check is done, in order, every time — a checklist stops steps being missed and makes the same job consistent whoever does it.

Q3. What is a CMMS used for in maintenance?

  • (a) Measuring insulation resistance
  • (b) Planning, scheduling, tracking and recording maintenance work
  • (c) Testing RCDs automatically
  • (d) Generating electricity for the site

Answer: (b) Planning, scheduling, tracking and recording maintenance work — a computerised maintenance management system keeps work orders, schedules, history and spare parts records in one place.

Q4. What mainly decides how often a maintenance task should be scheduled?

  • (a) The colour of the equipment
  • (b) The manufacturer’s recommendation, the duty of the equipment, its environment and how critical it is
  • (c) The day of the week the technician prefers
  • (d) The age of the building only

Answer: (b) The manufacturer’s recommendation, the duty of the equipment, its environment and how critical it is — a motor running 24 hours a day in a dusty place needs more frequent attention than a lightly used one in a clean room.

Q5. Two jobs are waiting: a scorch mark on a main breaker terminal and a flickering corridor light. Which should be done first?

  • (a) The flickering corridor light, because it is easier
  • (b) The scorch mark on the main breaker, because it is a safety-critical fault
  • (c) Whichever job was reported first
  • (d) Neither, until the next shutdown

Answer: (b) The scorch mark on the main breaker, because it is a safety-critical fault — safety and the risk of fire or a major outage always outrank a minor comfort issue.

Q6. What is a work order in maintenance?

  • (a) A purchase order for new equipment
  • (b) A written instruction describing the job, where it is, what to do and who does it
  • (c) A certificate proving an electrician’s qualification
  • (d) A list of tools in the workshop

Answer: (b) A written instruction describing the job, where it is, what to do and who does it — the work order authorises the work, guides the technician and creates a record when it is signed off.

Q7. What does a maintenance backlog mean?

  • (a) A store room full of spare parts
  • (b) Planned maintenance work that is overdue and still waiting to be done
  • (c) A new maintenance plan for next year
  • (d) A record of completed jobs

Answer: (b) Planned maintenance work that is overdue and still waiting to be done — a growing backlog means inspections and servicing are falling behind, which raises the risk of failures.

Q8. What is seasonal maintenance?

  • (a) Maintenance done only in winter
  • (b) Servicing equipment before the season when it will be used most, such as checking air conditioning before summer
  • (c) Replacing equipment every season
  • (d) Cleaning solar panels after rain

Answer: (b) Servicing equipment before the season when it will be used most, such as checking air conditioning before summer — doing the work ahead of peak demand avoids failures when the equipment is needed most.

Q9. Who should approve a change to a planned maintenance schedule?

  • (a) Anyone working on site
  • (b) The maintenance supervisor or manager responsible for the equipment
  • (c) The equipment supplier’s sales team
  • (d) No approval is needed to skip a scheduled task

Answer: (b) The maintenance supervisor or manager responsible for the equipment — skipping or delaying a scheduled task changes the risk, so the person accountable for the equipment must agree.

Q10. What is the difference between a planned shutdown and an emergency shutdown?

  • (a) There is no difference
  • (b) A planned shutdown is arranged in advance with work prepared, while an emergency shutdown is an immediate stop because of a fault or danger
  • (c) A planned shutdown is always longer
  • (d) An emergency shutdown is arranged weeks in advance

Answer: (b) A planned shutdown is arranged in advance with work prepared, while an emergency shutdown is an immediate stop because of a fault or danger — planned work is safer and cheaper because parts, people and permits are ready.